Documents (restricted access)

 

Deliverables

2015 01 30 KAStrion_WP5_D5.4_Report on the validation of the prototype results by condition monitoring experts

2015 01 29 KAStrion_WP0_D0.5_Overview of norms, regulation, insurance

2015 01 29 KAStrion_WP5_D5.6_Off-shore wind turbine data base and report on the evaluation of the prototype on off-shore wind turbines

2015 01 28 KAStrion_WP5_D5.5_On-shore wind turbine data base and report on the six months evaluation

2015 01 27 KAStrion_WP0_D0.6_Propose Kastrion G2Market for each KIC partner

2015 01 27 KAStrion_WP2:

2015 01 27 KAStrion_WP4_D4.4_Development of the WWW based user interface

2015 01 27 KAStrioin_WP5:

2014 11 12 KAStrion_WP4_D4.5_Data analysis & reporting modules with basic functionality

2014 03 31 KAStrion_WP4:

2014 02 20 KAStrion_WP2_D2.6_Polyphase electrical module completed

2014 02 20 KAStrion_WP2:

2013 11 14 KAStrion_WP3:

2013 05 31 KAStrion_WP5_D5.1_Wind turbine test bench specifications

2013 03 31 KAStrion_WP2_D2.2_Failure mode analysis for wind turbines

2013 03 31 KAStrion_WP2_D2.1_Synopsis of the solution architecture

2012 04 07 KAStrion_WP0_Market Analysis

 

2015 01 28 End of Project review - Barcelona, Spain

Presentation (pdf)

 

2014 11 25, 26 and 27 KAStrion steering board meeting in EC Systems, Krakow, Poland

Steering Board meeting Minutes (Nadine Martin - Grenoble INP)

State of KAStrion project - Program of the 2  days - Meeting targets and conclusions (Nadine Martin - Grenoble INP)

MECAL expertise on KAStrion signals (Harmen Links - MECAL)

CETIM failure reporting on KAStrion signals (Nicolas Bédouin - CETIM)

VALEMO return from current installed system, WP5 review and User return of KAStrion system (Alexis Lebranchu - VALEMO)

AStrion-A and order analysis: results on KAStrion signals (Zhongyang Li - Grenoble INP)

AStrion-IHKMS: failure detection on KAStrion results (Marcin Firla and Timothée Gerber - Grenoble INP)

SMESA: failure detection on KAStrion signals (Georgia Cablea - Grenoble INP)

AStrion and SMESA offline interface for the surveillance (Zhongyang Li - Grenoble INP)

Communication: KIC guidelines (Gildas Rivière - Grenoble INP)

Market update (Tomasz Barszcz - EC Systems)

Comparative data analysis between MECAL, CETIM, ECS and AStrion system (Zhongyang Li - Grenoble INP)

Gantt chart: Final deliverable list (Gildas Rivière - Grenoble INP)

IP license (Gildas Rivière - Grenoble INP)

Grant Agreement 2014(Gildas Rivière - Grenoble INP)

 

2014 06 16 Mid year project review

Presentation (pdf)

 
2014 05 21-22 KAStrion steering board meeting in MECAL, Netherlands

KAStrion steering board meeting minutes (docx)

KAStrion steering board meeting minutes (pdf)

State of KAStrion project - Program of the 2  days - Meeting targets (Nadine Martin - G-INP)

Current CETIM analysis on KAStrion testbench (Nicolas Bedouin - CETIM)

Current AStrion results on KAStrion testbench (Marcin Firla and Timothée Gerber - G-INP)

Current SMESA results on KAStrion testbench (Georgia Cablea - G-INP)

WP2 Proof of concept and Gantt chart follow-up (Pierre Granjon - G-INP)

WP3, WP4 and WP0 follow-up (Tomasz Barszcz - EC-Systems)

WP5 Alarm statistics on a set of windturbines (Alexis Lebranchu - VALEMO)

WP5 Arfons installation follow-up (Frédéric Prévost - VALEMO)

WP5 Follow-up (Sophie Sieg-Zieba - CETIM)

WP1 Financial and administrative follow-up (Gildas Rivière - G-INP)

CC Iberia Mid-review (Gildas Rivière - G-INP)

Data sharing (Zhongyang Li - G-INP)

 

2014 01 14 End of Year Project review - Barcelona, Spain

Presentation

 
2013 11 13 to 15 KAStrion project steering board meeting - Grenoble INP, GIPSA-Lab - France
KAStrion steering board minutes (docx)
KAStrion steering board minutes (pdf)
2013 11 13 Kastrion_AStrion (G-INP)
2013 11 14 Kastrion_Steering board introduction (G-INP)

2013 11 14 Kastrion_WP5 Test Bench Follow-up (CETIM)

2013 11 14 Kastrion_Installation of VIBEX in Arfons (VALEMO)
2013 11 14-15 Kastrion_Condition Monitoring System (EC-Systems)
2013 11 14 Kastrion_AStrion approach (G-INP)
2013 11 14 Kastrion_AStrion I and a simulated vibration signal (INPT)
2013 11 14 Kastrion_AStrion H (G-INP)
2013 11 14 Kastrion_Simulated signal (G-INP)
2013 11 14 Kastrion_AStrion K (G-INP)
2013 11 14 Kastrion_AStrion M (G-INP)
2013 11 14 Kastrion_AStrion S (G-INP)
2013 11 14 Kastrion_AStrion K real example (G-INP)
2013 11 14 Kastrion_Failure indicators in time (G-INP)
2013 11 14 Kastrion_Comparison Generator Bearing Lubrication (MECAL)
2013 11 14 Kastrion_High Speed Shaft Bearing Damage FFT (MECAL)
2013 11 14 Kastrion_Main Bearing Signal (MECAL)
2013 11 14 Kastrion_PWM Frequency Generator Non-Drive End (MECAL)
2013 11 14 Kastrion_WP5 First Analysis (CETIM)
2013 11 15 Kastrion_Polyphase (G-INP)
2013 11 15 Kastrion_WP2 Follow-Up (G-INP)

2013 11 15 Kastrion_WP5 Follow-up (CETIM)

2013 11 15 Kastrion_WP1 Follow-up (G-INP)
2013 11 15 Kastrion_Go to Market (EC-Systems)
2013 11 15 Kastrion_EWEA Presentation (G-INP)
2013 11 15 Kastrion_EWEA Poster (G-INP)

 

2013 10 16 Welcome ceremony for KIC InnoEnergy MasterSchool students

2013 10 16 Presentation of KAStrion by Nadine Martin (ppt)

 
2013 06 18 Mid Year Project Review - Videoconference - Barcelona, Cracow, Grenoble

2013 06 18 Mid Year Project Review (ppt)

2013 06 18 Mid Year Project Review (pdf)

2013 06 18 Business Review

 
2013 05 23 KAStrion project steering board meeting - CETIM - Senlis, France

VALEMO 2013 05 23

WP3 ECS 2013 05 23

WP2 Failure Mode Analysis 2013 05 23

WP2 Follow-up 2013 05 23

WP2 Polyphase Electrical Analysis 2013 05 23

WP5 Test Bench 2013 05 23

AStrion Gearbox fault 2013 05 23

WP5 Follow-up 2013 05 23

AStrion and VIBex embedded system 2013 05 23

MECAL presentation 2013 05 23

MECAL Gear design 2013 05 23

MECAL Gear box inspection 2013 05 23

WP1 follow-up 2013 05 23

 

2013 01 14 End of Year Project review - Barcelona, Spain

Presentation

 

2012 11 29,30 KAStrion project steering board meeting - VALEMO - Bègles, France

Agenda

Presentation - Cost reporting procedure and informations

Presentation - General plan

Presentation - CETIM test bench

Presentation - ECS - WP3

Presentation - GRAVIT - WP0

Presentation - G-INP - WP2

 

2012 07 05 Mid Year Project review - Barcelona, Spain

WP0 2012 07 05

presentation

 

2012 07 03 Business review - videoconferene with CC Iberia Barcelona

presentation

 

2012 03 15 Kick-off meeting - Grenoble France

Kick-off meeting minutes

Partner presentations

Speaker presentations